Fine Arts external building repairs
Construction Dates |
Completed September 2004 |
Description |
This project repaired the deteriorated and leaking exterior wall joints from the ground to the roof parapet of the 5-story section and provided a new top color coat to the exterior of the building. Deteriorated concrete wall surfaces on the original 2-story building section were also repaired. New aluminum windows on the south, east, and west sides of the building were installed. |
|
|
|