Capital Planning, Design & Construction

Image: Photos of SF State students and scenes from around campus

Mary Park Hall and Mary Ward Hall Restroom Renovations

   
Construction Dates
Completed in August 2009
Description

As part of the overall renovations of Mary Park and Mary Ward Halls this summer, twelve restrooms are being completely renovated (eight restrooms in Mary Park and four in Mary Ward). These twelve restrooms are the last of the restrooms in these residence halls to be renovated and should much improve the quality of life for incoming and future student residents.

Scope of work

Improvements include an overall reconfiguration of the floor plans to meet accessibility standards and new tile floor and wall surfaces. The project also includes replacement of all toilets and partitions, sinks, countertops, mirrors, accessories and lighting. New water fountains adjacent to some of the restrooms will be recessed in the walls so that they don’t intrude on the corridor.

Progress Report

As of late June, most of the demolition work has been completed by the two general contractors performing the work and wall framing and rough plumbing and electrical work is nearing completion.

Detail

Green-friendly products were specified where possible, such as low-flow fixtures, products containing recycled materials, and high-efficiency light fixtures.

   
   

 

 

SF State Home