Project Name HSS Seismic Shoring
Phase Construction Dates Description Progress Report Details Album
Phase
Construction Dates Summer 2003 (completed)
Description

This project shored up and strengthened the original, southern section of the HSS Building, which was designed and constructed to the standards of the 1950s, and was therefore more susceptible to sustaining damage during earthquakes than newer buildings.

Progress Report

 

Details

Full height support and steel brackets were added to the columns. Work was conducted by the contractor four columns at a time.

Album N/A 