Project Name Fine Arts Building External Repairs
Phase Construction Dates Description Progress Report Details Album
Phase
Construction Dates Completed September 2004
Description

 

This project repaired the deteriorated and leaking exterior wall joints from the ground to the roof parapet of the 5-story section and provided a new top color coat to the exterior of the building. Deteriorated concrete wall surfaces on the original 2-story building section were also repaired.  New aluminum windows on the south, east, and west sides of the building were installed.
 

Progress Report  
Details  
Album N/A 