This project repaired the
deteriorated and leaking exterior wall joints from the ground to the roof
parapet of the 5-story section and provided a new top color coat to the exterior
of the building. Deteriorated concrete wall surfaces on the original 2-story
building section were also repaired. New aluminum windows on the south,
east, and west sides of the building were installed.
|