Amphitheater Waterproofing Rehabilitation – Cesar Chavez Student Center
Construction Dates
2009-2010 (completed)
Description
The project replaces the substrate and waterproofs the Cesar Chavez Student Center amphitheater (north pyramid), including removal and re-installation of the existing pre-cast concrete seats.
Scope of work
Removal of the existing waterproofing and installation of a liquid hot rubberized, asphalt, fully reinforced waterproofing system to cover all surfaces below the existing pre-cast concrete seats and repair of deteriorated surfaces.